CriticalWater Utilities

Combined Sewer Control Facility Electrical Construction

The city was set to award three construction contracts totaling roughly $45.5 million for the Combined Sewer Control Facility, part of its Long Term Control Plan to stop combined sewer overflows into the Hudson. A companion bond resolution would amend the project's 2022 financing. This is one of the biggest infrastructure investments on the city's books.

4 mentions (1 this month)Last discussed Nov 5, 2026
HighWater Utilities

Water Filtration Plant Filter and SCADA Improvements

The council was scheduled to consider a $7.77 million contract with Gallo Construction Corp. to upgrade filters and the SCADA control system at the city's water filtration plant. It's one of the largest infrastructure investments on the agenda and affects the reliability of the city's drinking water.

3 mentions (2 this month)Last discussed Oct 26, 2026
MediumWater Utilities

Brown's Pond Water Withdrawal Alternatives Analysis

The council was scheduled to consider contracts for water quality testing ($12,824) and algae treatment ($3,691 per treatment) at Browns Pond. This relates to the city's drinking water source protection.

3 mentions (2 this month)Last discussed Oct 26, 2026
HighWater Utilities

Emergency sewer repairs on Broad Street

A $485,000 transfer within the sewer fund would pay for emergency sewer repairs on Broad Street.

1 mentionLast discussed Sep 24, 2026
HighWater Utilities

Water department staffing and rate stability

Veteran water staff with 87 combined years are retiring, and Vradenburgh wants long-overdue pay upgrades for positions untouched in 30 years. Big equipment purchases may go into a bond paid through facility fees instead of water rates, keeping user rates flat.

1 mentionLast discussed Sep 23, 2026
MediumWater Utilities

Aging water valves and main break risk

Many large valves date to the late 1800s — one broke during the Ellis Avenue main break that shut off half the city. The 2027 budget starts a proactive insertion-valve replacement program, about one per year.

1 mentionLast discussed Sep 23, 2026
HighWater Utilities

PFOS and Catskill Aqueduct water reimbursement amendments

Amendments to two state DEC contracts that reimburse Newburgh for water purchased from the Catskill Aqueduct and for extra costs of providing alternative drinking water amid PFOS contamination.

3 mentionsLast discussed Sep 22, 2026
MediumWater Utilities

Rising sludge disposal costs

Getting rid of wastewater sludge now costs $1.5 million a year and could nearly double if New York bans land application of sludge. A newly awarded state biosolids study grant is the first step toward cutting costs and odors.

1 mentionLast discussed Sep 21, 2026
HighWater Utilities

West Trunk Sewer Rehabilitation Contract No. 3

Another sewer grant application — up to $4.4 million with a 25% match — to design and rebuild the West Trunk Sewer. Aging sewer infrastructure means expensive failures if it's not addressed.

2 mentionsLast discussed Jul 13, 2026
HighWater Utilities

Lead Service Line Replacement Funding

The council was to consider backing a state bill that funds replacing lead water service lines. Support could help Newburgh compete for pipe-replacement dollars.

3 mentionsLast discussed Jul 13, 2026
HighWater Utilities

South Interceptor Sewer Improvements

The council was scheduled to consider three state grant applications totaling up to more than $18 million for major sewer work — the South Interceptor Phase V and West Trunk Sewer Contract No. 3. These are core pieces of the city's long-term sewer control plan.

2 mentionsLast discussed Jul 13, 2026
LowWater Utilities

Water Plant and Recreation Facility Assessments

Small contracts were scheduled for a $14,500 concrete evaluation at the drinking water filtration plant and a $923 asbestos test at the Recreation Department's Quonset huts.

1 mentionLast discussed Jul 9, 2026
HighWater Utilities

Long Term Control Plan Sewer Contracts

Three ARCADIS contracts totaling about $2.18 million were slated for discussion — South Interceptor ($496,300), West Trunk Sewer ($712,900), and Liberty Street sewer separation ($974,900). These design contracts advance the city's multi-year effort to cut sewer overflows into the Hudson.

2 mentionsLast discussed May 21, 2026
HighWater Utilities

Washington Lake Dam Engineering Assessment

The council was set to discuss a $25,000 engineering assessment of the Washington Lake Dam — the reservoir serving Newburgh's water supply. Knowing the dam's condition matters for water safety and future repair budgeting.

1 mentionLast discussed May 21, 2026
MediumWater Utilities

Wastewater Treatment Plant Administration Building Rehabilitation

Three change orders with contractors Barone, E-J Electric, and DJ Heating & Air Conditioning were proposed for the wastewater plant admin building rehab project. Change orders adjust the cost and scope of ongoing work at a key city facility.

2 mentionsLast discussed May 11, 2026
MediumWater Utilities

NYS EFC SECURE Cybersecurity Grant

The council was to consider applying for a $50,000 state grant to strengthen cybersecurity for city utilities — with no city match required.

2 mentionsLast discussed May 11, 2026